Indicative works for industrial facilities:

     Load studies to be used depending on the type of industrial space and individual needs. Issuance of all the necessary certificates for the permanent electricity supply by PPC.

     Lighting studies for office and machine areas according to needs. This study also describes ways to save energy and reduce electricity consumption.

     Installation of site electrical panel and issuance of site supply certificate for temporary electrification of the building by PPC (necessary for the work of the workshops).

     Placement of patient and strong current boards.

     Excavation of walls with a compressor or a special milling machine depending on the specifications of the building.

     Installation of piping, switch boxes and junction boxes.

     Installation of cables and execution of necessary branches.

     Placement of tables.

     Installation of cable tray, plastic electrical conduit or heavy-duty plastic electrical conduit of appropriate size for routing cables and installation of power switches.